The coverage a ton this stonemason got, beside the tag, and what the wall cost a square foot
Type the wall as you measured it, the coverage figure the yard printed on the pallet tag and the figure on the mortar sack, the tons the lorry left, and where all of that stone went: this sheet keeps five fates of the stone the yard delivered apart, which are the stone laid into the measured face, the stone culled at the pallet, the stone lost as offcut and breakage while laying, the stone returned to the yard for credit, and the good stone left whole on a part pallet and carried away. Then your invoice and your hours. It prints what the wall cost a square foot of finished face, the coverage a ton and the mortar bags a hundred square feet this crew got, each beside the figure you were quoted, and the tons and bags the next wall wants at the rate you got.
Turns the stone, mortar, sand and hours you recorded for a finished wall into its cost per square foot and the coverage per ton and per bag you actually got, beside the figures you were quoted, every line shown.
Every figure here is arithmetic on figures you type, and the working for each one is printed beside it. The coverage figures, the bag figures, the joint width and every dimension are yours, read off the pallet tag, the sack, the invoice or the plans: this sheet holds none of its own and suggests none. It says nothing about what to ask for a wall. Nothing you type leaves your browser, and nothing is stored.
AThe wall, at a glance
Recorded for Cotswold random walling on Garden wall at the Mill House.
The figure this sheet exists for is the one a pallet tag cannot give you: the coverage your own stone, at your own joint, on your own wall, actually reached, printed beside the figure you were quoted and used to size the next order.
Printed from otherworldlabs.com, the stonemason's wall log.
BThe wall, and the figures you were quoted
The two quoted figures are yours to read off the pallet tag and the mortar sack. This sheet carries no coverage figure, no bag figure and no joint of its own, and it never fills one in for you.
CThe stone the yard delivered, and where it went
Kept one pile? Put the whole pile in the tons that never reached the wall and leave the culled-at-the-pallet figure blank. Every figure on this page is unchanged: the two fates print as one line labelled as both.
DThe invoice, the hours, and the next wall
Your own rate, your own invoice. No rate, price or hour is suggested here.
EWhere every ton of the delivery went
Five fates, and the row labels name all five whether or not you kept the culled stone and the offcut apart. Keep one pile and the two print as one line labelled as both; keep them apart and they print as two.
| Where the stone went | Tons | Share of the delivery |
|---|---|---|
| Laid into the measured face | 9.00 | 75.0% |
| Culled at the pallet | 0.60 | 5.0% |
| Offcut and breakage while laying | 0.50 | 4.2% |
| Returned to the yard for credit | 1.50 | 12.5% |
| Left whole on a part pallet | 0.40 | 3.3% |
FQuoted, and what this crew got
The quoted column is the figure you typed off the tag and the sack. The gap column prints how far the wall landed from it, as a figure and as a share of the quoted figure, with the word beside it saying which way.
| Measure | Quoted | This wall | Gap | Gap on the quoted figure |
|---|---|---|---|---|
| Coverage a ton consumed | 35.00 | 40.59 | 5.59 more | 16.0% more |
| Coverage a ton in the face | 35.00 | 45.56 | 10.56 more | 30.2% more |
| Mortar bags a hundred square feet | 9.00 | 9.27 | 0.27 more | 3.0% more |
GThe next wall, at the rate you got
Sized at the coverage the stone consumed on this wall, not at the quoted figure. A part pallet is left as a part pallet: whether the yard will break one is a question for the yard.
| To order | Figure |
|---|---|
| Tons to order | 6.41 |
| Whole pallets | 4 |
| Part pallet, tons | 0.41 |
| Mortar bags | 24.1 |
HEvery figure, worked
The stone, and what the wall carries of it.
Mortar, sand, hours, and the wall.
The tonnage, the coverage, and the next order.
IHow the figures are read
- The pile
- The stone that never reached the face and was neither credited nor carried away: culled at the pallet, or lost as offcut and breakage while laying. One figure is enough for every figure this sheet prints, because the stone in the face is the delivery with the pile, the return and the part pallet taken off it. Splitting the pile refines one row of the fates table and nothing else.
- Culled stone and offcut stone
- Two events in the record and one event in the arithmetic. Both are stone you paid for that never reached the face and came back as neither credit nor carried stock, so each of them lifts the cost a square foot and cuts the coverage a ton, and no figure on this sheet can tell them apart. They are named apart because one is stone the yard sent that you could not use and one is stone your own crew cut or broke, and a season of the two tells you different things.
- Coverage a ton consumed
- The measured face divided by the tons the wall consumed, which is the delivery with the return and the part pallet taken off it. This is the figure to order the next wall at: the pile is in it, because a pallet of this stone at this joint arrives with the culls and the offcut it arrives with.
- Coverage a ton in the face
- The measured face divided by the tons that reached it. This is the figure to read the stone itself by, with the waste taken out of the way. It is dashed, never estimated, while the pile is blank.
- Bags a hundred square feet
- The bags you used, divided by the measured face, for one hundred square feet of it. Your joint width and your bed are in this figure and in nothing else here, which is why the joint is recorded on the sheet.
- The credit, and the part pallet
- Stone sent back leaves this wall's cost at your price a ton, with the yard's own deduction taken off the credit. Good stone left whole on a part pallet also leaves this wall's cost, at your price a ton and with nothing deducted, because it is standing in your yard for the next job and is not lost. Both are printed as their own lines.
- The overrun
- The tons by which the pile, the return and the part pallet together run past the delivery. It is arithmetically impossible on a real wall, so the sheet reads it as a typing error: it prints the tons of the excess, holds the glance figures back, and dashes the share column, so no share of the delivery runs past a hundred.
JThe four cases the arithmetic does not settle
Each of these is yours to decide, and none of them is decided here. The options are set out and the sheet prints whichever reading you type.
A wall of two stones
A wall laid in two products has two tags and two coverage figures. You may record it as two walls, each with its own face area and its own tonnage, or as one wall at the product that carries most of it, with the second product's tonnage in the pile. The first keeps both coverage figures; the second keeps one wall in the log. This sheet takes one product at a time.
A part pallet that is used on the next wall, or in a year
Stone carried away leaves this wall's cost whole. Where it is laid next week, the next wall carries it at that price a ton, and your log shows the pallet twice for one lot of money, once as carried away and once as delivered. Where it stands in the yard for a year, some stonemasons write it down to nothing at the year's end and carry the cost on the wall that paid for it. Either is a decision about your own books.
Stone the yard credits in part, or not at all
A yard may credit returned stone whole, credit it with a deduction, credit it against the next order only, or refuse it. The sheet takes the deduction as a percent and prints the credit it leaves. A credit held against a future order is money you have not got yet: some stonemasons type it as zero on this wall and carry it in the log as a note against the yard.
A wall cut from two deliveries
Where a second load arrives mid-wall, the tons and the invoice lines add up to one delivery for this sheet, and the two tickets stay in the log. Where the second load is another pallet of that product at another price a ton, the honest figure is the money: add the two invoices and type the price a ton that the whole tonnage comes to.
KWhat this sheet will not do
- It names no coverage, no yield, no bag count, no joint and no dimension as the right one. Every such figure on it is one you read off a tag, a sack, an invoice or a drawing and typed in, and arithmetic is the only thing the sheet adds.
- It says nothing about what a wall should be sold for, and it holds no figure of that kind: there is no figure of its own in it at all, for any stone, any yard or any trade.
- It holds one finished wall and keeps nothing. Close the page and the figures are gone; the two files sold beside it are what carry a season of walls.
- It says nothing about how a wall is built or specified, nothing about the paperwork a job has to carry, and nothing about how stone is worked on site. It is a record of tons, bags, hours and money after the fact.
- It reads nothing in from anywhere. No figure on it came from a supplier, a table or a survey, because there is no such figure in it.
LThe wall log kit
The sheet on this page keeps nothing. The kit is two files, and the workbook is the one that keeps a season of walls: five sheets, with the formulas left in. Stones: one row a stone product, eight rows of them, with the name as the yard prints it, the label the Walls sheet picks it by, the yard, and where you read the tag figure. Walls: one line per finished wall, four hundred of them — you type the date, the stone, your own name for the wall, the face area off your tape, the joint as you measured it, the coverage figure off the tag and the bag figure off the sack, the tons delivered, the pile that never reached the wall and the part of it culled at the pallet, the tons sent back and the deduction the yard took on them, the tons carried away whole, the yard's own pallet size, the price a ton and the haulage, the mortar bags and the sand with their prices, and the hours at your own rate; then along that line the sheet works out the tons consumed, the tons in the face and the offcut, the credit for the return, the cost held back on the part pallet, the stone this wall carries, the mortar and sand, the material, the labour, the wall itself, the cost a square foot, the coverage a ton consumed and in the face, the bags a hundred square feet, the gap on the tag, the gap on the sack, and a Check column that says what the line is still waiting for, or what cannot be true of a delivery. The first two lines of that sheet arrive filled in, and the two stones they name with them: they are ours, a demonstration of the arithmetic, and the sheet's own note says as much — type over them or delete them. Stone summary: the log as it stands, and then the season table, one column a stone — the walls counted, the face laid, the tonnage consumed, the coverage a ton you got beside the quoted figure weighted by the tonnage it was quoted for, the gap, the bags a hundred square feet, the money, the cost a square foot, and the tons a hundred square feet to order the next wall at. Check: the identities that have to hold, each worked two ways over this record, with the difference printed and a yes or a NO beside it. Read me: what the book is, which sheets are in it, and the fingerprint of the spec it was built from. The second file is the short PDF: the five rules the arithmetic follows and the four decisions it cannot settle for you, the part pallet standing in your yard among them. Every figure outside the typed columns is a formula you can open and read, so a tonnage corrected in June moves the costs, the rates and the season table with it.
Two files, yours to keep. No account, no subscription.
Order stone short and the wall waits on a second delivery nobody is paying for. This page costs one wall. Where your own material log carries courses, faces, waste and a yard rate this page never asks about, write out the columns you keep on paper and the figures you need at the bottom, and a workbook is built to those columns. Free to ask.