Several pours, footed into the order: cubic yards, cubic feet and the whole bags your dimensions divide into

Type the slabs, footings and columns you are about to pour - three geometries - and it prints the cubic yards, the cubic feet and the whole bags at the yield you type. Each pour keeps its own shape, its own dimensions and its own item count, and they foot into one order in both units, with your waste allowance printed as you typed it and again as it applies.

Turns dimensions you have already measured into a purchase quantity: a volume in cubic yards and in cubic feet, and the whole bags that volume divides into at the cubic feet one bag fills.

This sheet converts and never specifies. Nothing it prints is a specification anyone builds to: it says nothing about thickness, depth, reinforcement, strength, mix or code, and it never tells you a dimension is adequate. The cubic feet one bag fills is read off the bag you are holding, where the bag prints it, and the waste allowance is your own, as you work. Nothing you type leaves your browser, and nothing is stored: close the page and the figures are gone.

AThe order, at a glance

Cubic yards to order, your allowance innot yet
Whole bags to order, your allowance innot yet
Cubic yards the pours themselves makenot yet
Cubic feet the pours themselves makenot yet
Whole bags, before the extra is addednot yet
Pour cards carrying a shape, a name or a dimension, while the order is still being filled in1

Figured for this order. The cubic feet one bag fills is not typed yet, so the bag counts are dashed.

The figure this sheet exists for is the purchase quantity: what the geometry you measured is in the unit the yard sells and in the unit the bag is labelled, over several pours at once, with one allowance applied to all of them.

BThe pours you are about to buy concrete for

Only have the job's total cubic yards? A total forces no split back into pours, so do not invent dimensions to make one foot: type each pour's own figures instead. If the bag count is all you want from a total you already trust, that is your total yards x 27 = cubic feet, divided by the cubic feet one bag fills, taken up to the next whole bag, with your allowance on top.

Pour one

CThe order, a row for each pour

PourGeometryThe dimensions usedItemsCubic feetCubic yardsBags at your yieldWhole bagsCubic feet, allowance inCubic yards, allowance inWhole bags, allowance in
Pour oneSlab, length and width, still being filled innothing typed yet-not yetnot yetnot yetnot yetnot yetnot yetnot yet
All pours on this order, still being filled in---not yetnot yetnot yetnot yetnot yetnot yetnot yet
The allowanceFigure
The allowance, with none typednot yet
Cubic feet the allowance adds to the ordernot yet
Whole bags the allowance adds to the ordernot yet

DEvery figure, worked

Each pour, from the dimensions you typed

The order, footed and divided into bags

EHow the figures are read

The three geometries
A slab is an area times a thickness. A footing is a run times a width times a depth. A column is a circle times a height. Those are the three this sheet distinguishes, and there is no fourth anywhere on the page or in the file sold beside it.
The slab's two entry modes
A slab typed as a length and a width, and a slab typed as its square footage, are two ways of typing one area rather than a fourth geometry. A reader quoted four hundred and eighty square feet holds that area and holds no length and no width, so the sheet takes the area, prints the area, and never invents a pair whose product happens to fit.
The cubic feet one bag fills
The yield is the figure printed on the bag in your hand, and it is the only thing that turns a volume into a bag count. This sheet holds no yield for any product and suggests none. Until you type it, every bag count on the page is dashed and the volumes are printed without one.
Whole bags, and why the rows can foot high
Half a bag is not sold, so every bag count is taken up to the next whole bag. The order line takes the whole order's volume up once; each row takes its own pour up on its own. The rows can therefore foot to a bag or two beyond the order line, and the working says so where it happens rather than hiding it.
The allowance, twice
The allowance prints as you typed it, as a percentage, and again as the cubic feet and the whole bags it adds. The bag count with the allowance in is taken from the volume with the allowance in, never from a bag count that has already been rounded up.
Cubic yards and cubic feet
A cubic yard is twenty-seven cubic feet. Both units are printed for one reason: the yard sells in one and the bag is labelled in the other, and one volume has to be read back in whichever unit the counter desk is using.
What is incomplete
A pour you have started is one carrying a name, a geometry or a dimension of its own. It is complete when every dimension its own shape and its own entry mode need is typed. Until every started pour is complete and the yield is in, the order totals print no figure at all and the glance says what they are waiting on.

FThe cases the arithmetic does not settle

Each of these is yours to decide, and none of them is decided here. The options are set out and the sheet prints whichever reading you type.

A pour that is not one of the three shapes

A trench with sloped sides, a stepped footing, a pad with a thickened edge: none of them is a box or a cylinder. Some crews break the pour into the three shapes and type each piece as its own pour. Others type the shape that holds most of the volume and carry the rest in the waste allowance. The first keeps the geometry readable on the sheet; the second keeps one row. This sheet takes the shapes you type and adds nothing for a slope it cannot see.

Bags against ready-mix

A volume is sold both ways, and the sheet prints both readings of it: the yardage a truck is ordered in, and the bag count at the yield you typed. Which one a job wants is a decision about the job, not about the arithmetic, and nothing here recommends either.

Where the allowance belongs

Some crews put their allowance on the volume, as this sheet does. Others order whole pallets and let the pallet rounding carry it. Others again carry an allowance on the slab and none on the footings. The sheet applies one typed percentage to the whole order; a different allowance for a different pour means a second order sheet, and the file sold beside this page keeps both.

What a short pour costs

A pour that runs out mid-placement is not a volume question by the time it happens. The sheet's job is the record of what was ordered and on what assumption, which is the thing worth having when a yard and a crew are reading one order back to each other.

GWhat this sheet will not do

HThe bag-and-yard order sheet

The page is the arithmetic. The kit is the order a supplier is handed and the record you keep: a workbook with a line for each pour, carrying the dimensions as you typed them, the volume in cubic yards and cubic feet, the bag count at the yield that was typed, your allowance written as typed and as applied, and the order footed the way a counter desk reads it back. Every figure in it is live in a formula with no pasted value, so a pour you change or a bag of another yield is re-footed in place, with no retyping. It is sold as the record of what was ordered and on what assumption, not as an authority: a supplier re-quotes from its own figure, and this is the sheet that says what you asked for.

Take the bag-and-yard order sheet — $19

A workbook and the rules in a short PDF, yours to keep. No account, no subscription.

Come up two bags short and the pour sets without them. This page answers one order. Where you are ordering for a run of footings, slabs and pads and you need each one and the week together on a sheet, send the columns you keep and your own rules in plain words, and a workbook is built for the week. Free to ask.